From one engineer to ETC
From the first job in 2010 to ETC, one year at a time.
-
2010
2010
Into the field at KEM Consultancy
Mostafa Ahmed joins KEM Consultancy and manages major projects there, among them the Electrolux factories compound (formerly Olympic Group) and commercial buildings in New Cairo.
-
2014
2014
Projects under his own name
He begins executing projects himself, for clients including the Egyptian Belgian Group factory at Abu Rawash.
-
2015
The first project
Still under his own name: fire systems for Pasta Mania, his first project, then electrical design and installation for GEA Grade Refrigeration in El Obour and puddle flanges for SODIC's 5,000 m³ water tank.
-
2017
ETC is founded
In January. The same year: the steel structure of the Mondelez product showroom in 10th of Ramadan, and supervision for Lulu's Emerald branch.
-
2018
Under the metro
Platform A/C ductwork at Heliopolis Metro Station, for El Hoda Group and the main contractor, Arab Contractors.
-
2019
Into pharma and food
RMU, transformer and MV/LV works for the MTBI pharmaceutical factory in Badr, and a whole-factory LV network for Almonairy Corn Products.
-
2020
40 MVA in the desert
A 40 MVA overhead network for Al Naem Farm 2 at Wadi El Natrun, and all utilities for Danube Home's 6,000 m² branch at Emerald Mall.
-
2021
A whole mall
Every mall utility, supplied and installed, for Orium Mall in El Shorouk City.
-
2023
50,000 m², total electromechanical
Total electromechanical design and build across Asten College's 50,000 m² built-up area.